Traffic Advisory

Muskoka Road 3 (Aspdin Road) closed at Rosseau River Bridge until December 20

Muskoka Road 3 (Aspdin Road) will be fully closed to all through traffic at the Rosseau River Bridge beginning 7:00a.m. on November 23, 2015 through to 5:00p.m. on December 20, 2015. The purpose of the closure is to accommodate the planned rehabilitation of the bridge which is located approximately 6.0 km east of Rosseau village. The main detour route includes Hekkla Road and Gross Road in the Township of Muskoka Lakes (see map below).

Muskoka Road 3 detour

The District Municipality of Muskoka would like to thank all those affected for their patience while these necessary bridge improvements are completed. Progress updates and additional information will be available throughout the project on our website: www.muskoka.on.ca/content/road-construction or follow us on Twitter: @districtmuskoka or @muskokarecycles.


Don’t miss out on Doppler! Sign up for our twice-weekly email digest and get some of our top stories delivered right to your inbox.

* indicates required




Join the discussion:

Your email address will not be published. Required fields are marked *

All comments are moderated. Please ensure you include both your first and last name and abide by our community guidelines. Submissions that do not include the commenter's full name or that do not abide by our community guidelines will not be published.

0 Comments