{"id":94116,"date":"2021-02-03T09:03:41","date_gmt":"2021-02-03T14:03:41","guid":{"rendered":"https:\/\/huntsville.dopperonline.ca\/?p=94116"},"modified":"2021-04-28T14:24:13","modified_gmt":"2021-04-28T18:24:13","slug":"countdown-for-main-street-reconstruction-is-on","status":"publish","type":"post","link":"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/","title":{"rendered":"Countdown for Main Street reconstruction is on"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p>It\u2019s a significant project and there will be lots of traffic disruptions.<\/p>\n<p>Huntsville\u2019s Main Street will get a complete makeover. The project, scheduled to begin March 1, will span an estimated 0.6 kilometres from Lorne Street to the swing bridge and will cost about $12.5 million (excluding HST).<\/p>\n<div style=\"float: left; margin-right: 14px;\"><strong><broadstreet-zone zone-id=\"45658\" keywords=\"\" soft-keywords=\"true\" zone-alias=\"\"><\/broadstreet-zone><\/strong><\/div>\n<p>The contract for $12,483,406.84, has been awarded to Dufferin Construction Company, and the District of Muskoka and the Town of Huntsville have entered into a Memorandum of Understanding for Huntsville\u2019s portion of the project at an anticipated $3.69 million.<\/p>\n<p>The District will undertake the cost of replacing aging water, sewer and stormwater infrastructure, minor improvements to the swing bridge such as weatherproofing and repainting, and minor water and sewer works along River Street. The Town of Huntsville will pay for the new streetscape as well as an anticipated $300,000 for improvements to Kent Park at the corner of Brunel and Main.<\/p>\n<p>Some of the highlights planned for Huntsville\u2019s Main Street (from Lorne Street to the swing bridge) as per the Town\u2019s streetscape site, which you can find <a href=\"https:\/\/myhuntsville.ca\/streetscape\"><span style=\"text-decoration: underline;\">here<\/span><\/a>, include:<\/p>\n<ul>\n<li>A new gateway at Lorne Street and Main Street marks the entrance where a broad view of Downtown Huntsville unfolds.<\/li>\n<li>Crosswalks marked with special paving will ensure safe pedestrian crossings and a signal to vehicles to slow down while travelling on Main Street through downtown.<\/li>\n<li>Both sides of Main Street have on-street parking in bays identified with special pavers that can also be locations for temporary caf\u00e9 areas or extra seating in the summer.<\/li>\n<li>A new Town Square in front of Town Hall and the Algonquin Theatre has special paving that extends from building face to building face. When Main Street is closed for events held year-round in Downtown Huntsville, this area will be the heart of the festivities.<\/li>\n<li>Sidewalks will be lined with street trees that have room underground to stretch their roots, be aerated and watered, ensuring healthy, long-lived trees.<\/li>\n<li>Muskoka chairs will be set out along the sidewalks of Main Street. &#8220;Muskoka Moments&#8221;, featuring granite boulders and areas planted with alder, birch, conifers, and dogwood, will bring the surrounding landscape onto Main Street.<\/li>\n<\/ul>\n<p>The work will be done in stages with road closures, and the corresponding detours, expected at each stage. District staff have put in place a reward\/penalty system to encourage the contractor to abide by the set timelines due to the importance of Main Street as a main thoroughfare and the disruption the work will mean for businesses and patrons downtown.<\/p>\n<p>Huntsville and District Councillor Brian Thompson told his fellow Huntsville councillors at their January 25 meeting that Bracebridge councillors are watching the development of the project with interest &#8220;because I think they&#8217;re going to be in a similar situation in the next four or five years when Manitoba Street will probably be subject to the same kind of thing as what we&#8217;re experiencing this year coming.&#8221;<\/p>\n<p>The anticipated project timeline calls for the paving of the entire length of the project sometime around May, 13, 2022, with completion of the entire project anticipated for the end of that month. Regular updates are expected <a href=\"https:\/\/www.engagemuskoka.ca\/huntsville-downtown-streetscaping\"><span style=\"text-decoration: underline;\">here.<\/span><\/a><\/p>\n<p>&nbsp;<\/p>\n<h5 style=\"text-align: center;\">Don\u2019t miss out on Doppler!<\/h5>\n<p style=\"text-align: center;\"><strong>Sign up <a href=\"https:\/\/doppleronline.ca\/huntsville\/dont-miss-out-on-doppler\/\"><u>here<\/u><\/a> to receive our email digest with links to our most recent stories.<br \/>\nLocal news in your inbox three times per week!<\/strong><\/p>\n<p style=\"text-align: center;\"><a style=\"background: #5cb85c url('https:\/\/d1iczxrky3cnb2.cloudfront.net\/red_logo.png') no-repeat 37px; color: #fff; text-decoration: none; font-family: Verdana,sans-serif; display: inline-block; font-size: 16px; padding: 15px 38px; padding-left: 75px; -webkit-border-radius: 2px; -moz-border-radius: 2px; border-radius: 2px; box-shadow: 0 1px 0 0 #1f5a89; text-shadow: 0 1px rgba(0, 0, 0, 0.3);\" href=\"https:\/\/donorbox.org\/support-huntsville-doppler\">Click here to support local news<\/a><\/p>\n<p style=\"text-align: center;\"><broadstreet-zone zone-id=\"45657\" keywords=\"\" soft-keywords=\"true\" zone-alias=\"\"><\/broadstreet-zone>\n","protected":false},"excerpt":{"rendered":"<p>It\u2019s a significant project and there will be lots of traffic disruptions. Huntsville\u2019s Main Street will get a complete makeover. The project, scheduled to begin March 1, will span [&#8230;]<\/p>\n","protected":false},"author":6,"featured_media":97083,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[10],"tags":[26,2364,2339],"class_list":["post-94116","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-breaking","tag-main-street-reconstruction","tag-streetscape"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Countdown for Main Street reconstruction is on - Huntsville Doppler<\/title>\n<meta name=\"description\" content=\"The project will span an estimated 0.6 Kilometres from Lorne Street to the swing bridge and cost about $12.5 million (excluding HST).\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Countdown for Main Street reconstruction is on - Huntsville Doppler\" \/>\n<meta property=\"og:description\" content=\"The project will span an estimated 0.6 Kilometres from Lorne Street to the swing bridge and cost about $12.5 million (excluding HST).\" \/>\n<meta property=\"og:url\" content=\"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/\" \/>\n<meta property=\"og:site_name\" content=\"Huntsville Doppler\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/HuntsvilleDoppler\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-02-03T14:03:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-04-28T18:24:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2021\/04\/Main-St-reconstruction-is-on.png\" \/>\n\t<meta property=\"og:image:width\" content=\"950\" \/>\n\t<meta property=\"og:image:height\" content=\"516\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Tamara de la Vega\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Hville_Doppler\" \/>\n<meta name=\"twitter:site\" content=\"@Hville_Doppler\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Tamara de la Vega\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/\"},\"author\":{\"name\":\"Tamara de la Vega\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/2b782f9c7568da44e264b6fc92035e8c\"},\"headline\":\"Countdown for Main Street reconstruction is on\",\"datePublished\":\"2021-02-03T14:03:41+00:00\",\"dateModified\":\"2021-04-28T18:24:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/\"},\"wordCount\":565,\"commentCount\":1,\"publisher\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#organization\"},\"image\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2021\/04\/Main-St-reconstruction-is-on.png\",\"keywords\":[\"breaking\",\"Main Street reconstruction\",\"streetscape\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/\",\"name\":\"Countdown for Main Street reconstruction is on - Huntsville Doppler\",\"isPartOf\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2021\/04\/Main-St-reconstruction-is-on.png\",\"datePublished\":\"2021-02-03T14:03:41+00:00\",\"dateModified\":\"2021-04-28T18:24:13+00:00\",\"description\":\"The project will span an estimated 0.6 Kilometres from Lorne Street to the swing bridge and cost about $12.5 million (excluding HST).\",\"breadcrumb\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/#breadcrumb\"},\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/#primaryimage\",\"url\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2021\/04\/Main-St-reconstruction-is-on.png\",\"contentUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2021\/04\/Main-St-reconstruction-is-on.png\",\"width\":950,\"height\":516},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/doppleronline.ca\/huntsville\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Countdown for Main Street reconstruction is on\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#website\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/\",\"name\":\"Huntsville Doppler\",\"description\":\"Read Local\",\"publisher\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/doppleronline.ca\/huntsville\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-CA\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#organization\",\"name\":\"Huntsville Doppler\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg\",\"contentUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg\",\"width\":760,\"height\":212,\"caption\":\"Huntsville Doppler\"},\"image\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/HuntsvilleDoppler\/\",\"https:\/\/x.com\/Hville_Doppler\",\"https:\/\/www.instagram.com\/huntsville_doppler\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/2b782f9c7568da44e264b6fc92035e8c\",\"name\":\"Tamara de la Vega\",\"description\":\"Moved to Huntsville 18 years ago and never left. I'll never really be a local - I still react to blackflies and mosquito bites - but Huntsville is the longest I\u2019ve ever lived anywhere and when your parents are gypsies you live in a lot of places. That's because I love this community. I love the wide open spaces, ancient rocks, lakes and forests. I also love the buzz of Huntsville's core and, well, the wi-fi. I'm a news and chocolate junkie. Respect integrity, talent, kindness, a good story and the taste of an organic tomatoe. I hope you like this site and don't be shy about pitching me a story.\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/author\/tamaradelavega\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Countdown for Main Street reconstruction is on - Huntsville Doppler","description":"The project will span an estimated 0.6 Kilometres from Lorne Street to the swing bridge and cost about $12.5 million (excluding HST).","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/","og_locale":"en_US","og_type":"article","og_title":"Countdown for Main Street reconstruction is on - Huntsville Doppler","og_description":"The project will span an estimated 0.6 Kilometres from Lorne Street to the swing bridge and cost about $12.5 million (excluding HST).","og_url":"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/","og_site_name":"Huntsville Doppler","article_publisher":"https:\/\/www.facebook.com\/HuntsvilleDoppler\/","article_published_time":"2021-02-03T14:03:41+00:00","article_modified_time":"2021-04-28T18:24:13+00:00","og_image":[{"width":950,"height":516,"url":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2021\/04\/Main-St-reconstruction-is-on.png","type":"image\/png"}],"author":"Tamara de la Vega","twitter_card":"summary_large_image","twitter_creator":"@Hville_Doppler","twitter_site":"@Hville_Doppler","twitter_misc":{"Written by":"Tamara de la Vega","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/#article","isPartOf":{"@id":"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/"},"author":{"name":"Tamara de la Vega","@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/2b782f9c7568da44e264b6fc92035e8c"},"headline":"Countdown for Main Street reconstruction is on","datePublished":"2021-02-03T14:03:41+00:00","dateModified":"2021-04-28T18:24:13+00:00","mainEntityOfPage":{"@id":"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/"},"wordCount":565,"commentCount":1,"publisher":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#organization"},"image":{"@id":"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/#primaryimage"},"thumbnailUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2021\/04\/Main-St-reconstruction-is-on.png","keywords":["breaking","Main Street reconstruction","streetscape"],"articleSection":["News"],"inLanguage":"en-CA","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/","url":"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/","name":"Countdown for Main Street reconstruction is on - Huntsville Doppler","isPartOf":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#website"},"primaryImageOfPage":{"@id":"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/#primaryimage"},"image":{"@id":"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/#primaryimage"},"thumbnailUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2021\/04\/Main-St-reconstruction-is-on.png","datePublished":"2021-02-03T14:03:41+00:00","dateModified":"2021-04-28T18:24:13+00:00","description":"The project will span an estimated 0.6 Kilometres from Lorne Street to the swing bridge and cost about $12.5 million (excluding HST).","breadcrumb":{"@id":"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/#breadcrumb"},"inLanguage":"en-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/"]}]},{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/#primaryimage","url":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2021\/04\/Main-St-reconstruction-is-on.png","contentUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2021\/04\/Main-St-reconstruction-is-on.png","width":950,"height":516},{"@type":"BreadcrumbList","@id":"https:\/\/doppleronline.ca\/huntsville\/countdown-for-main-street-reconstruction-is-on\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/doppleronline.ca\/huntsville\/"},{"@type":"ListItem","position":2,"name":"Countdown for Main Street reconstruction is on"}]},{"@type":"WebSite","@id":"https:\/\/doppleronline.ca\/huntsville\/#website","url":"https:\/\/doppleronline.ca\/huntsville\/","name":"Huntsville Doppler","description":"Read Local","publisher":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/doppleronline.ca\/huntsville\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-CA"},{"@type":"Organization","@id":"https:\/\/doppleronline.ca\/huntsville\/#organization","name":"Huntsville Doppler","url":"https:\/\/doppleronline.ca\/huntsville\/","logo":{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/","url":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg","contentUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg","width":760,"height":212,"caption":"Huntsville Doppler"},"image":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/HuntsvilleDoppler\/","https:\/\/x.com\/Hville_Doppler","https:\/\/www.instagram.com\/huntsville_doppler\/"]},{"@type":"Person","@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/2b782f9c7568da44e264b6fc92035e8c","name":"Tamara de la Vega","description":"Moved to Huntsville 18 years ago and never left. I'll never really be a local - I still react to blackflies and mosquito bites - but Huntsville is the longest I\u2019ve ever lived anywhere and when your parents are gypsies you live in a lot of places. That's because I love this community. I love the wide open spaces, ancient rocks, lakes and forests. I also love the buzz of Huntsville's core and, well, the wi-fi. I'm a news and chocolate junkie. Respect integrity, talent, kindness, a good story and the taste of an organic tomatoe. I hope you like this site and don't be shy about pitching me a story.","url":"https:\/\/doppleronline.ca\/huntsville\/author\/tamaradelavega\/"}]}},"_links":{"self":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/posts\/94116","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/comments?post=94116"}],"version-history":[{"count":0,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/posts\/94116\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/media\/97083"}],"wp:attachment":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/media?parent=94116"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/categories?post=94116"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/tags?post=94116"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}