{"id":81802,"date":"2020-02-27T13:31:18","date_gmt":"2020-02-27T18:31:18","guid":{"rendered":"https:\/\/huntsville.dopperonline.ca\/?p=81802"},"modified":"2020-02-27T13:31:18","modified_gmt":"2020-02-27T18:31:18","slug":"main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m","status":"publish","type":"post","link":"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/","title":{"rendered":"Main St. redesign options presented to council range from $2M to $4.8M"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p><span data-contrast=\"none\">Council was presented with three options for streetscape design finishes for Huntsville\u2019s Main Street as part of the road construction project next spring\u2014each with a different price tag.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:259}\"> <\/span><\/p>\n<div style=\"float: left; margin-right: 14px;\"><strong><broadstreet-zone zone-id=\"45658\" keywords=\"\" soft-keywords=\"true\" zone-alias=\"\"><\/broadstreet-zone><\/strong><\/div>\n<p>The presentation was made by EXP engineering, architecture and design consultants Les Ranta and Sally Wang, who were accompanied at Huntsville Council&#8217;s Feb. 24 meeting by Mark Driscoll from the District of Muskoka.<\/p>\n<p><span data-contrast=\"none\">The Main Street streetscape redesign is part of a larger road construction project being undertaken by the District of Muskoka in partnership with the Town of Huntsville in order to rebuild underground water, sewer, and stormwater infrastructure, reconstruct the roadway, and conduct minor maintenance on the swing bridge, while enhancing the downtown streetscape at a cost to be borne by the Town.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:259}\"> <\/span><\/p>\n<p><span data-contrast=\"none\">Work on Huntsville\u2019s Main Street is scheduled to begin in the early spring of 2021.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:259}\"> <\/span><\/p>\n<p><span data-contrast=\"none\">The options presented to council included the type of paving materials to be used for roadways and vehicle parking areas as well as sidewalks, crosswalks, and pedestrian amenity areas. <\/span><\/p>\n<p><span data-contrast=\"none\">The streetscape redesign would start at the swing bridge and run westward to Lorne Street. It encompasses Main Street and any of the adjacent feeder streets and pedestrian areas forming part of downtown Main Street, according to Ranta. He also said additional considerations in the options presented include Kent Park, a Lorne Street gateway, the King Street pedestrian walkway, and civic square.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:259}\"> <\/span><\/p>\n<div id=\"attachment_81819\" style=\"width: 760px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-81819\" class=\"wp-image-81819 size-full\" src=\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/streetscape_muskokamoments.jpg\" alt=\"\" width=\"750\" height=\"562\" srcset=\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/streetscape_muskokamoments-300x225.jpg 300w, https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/streetscape_muskokamoments-630x472.jpg 630w, https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/streetscape_muskokamoments.jpg 750w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><p id=\"caption-attachment-81819\" class=\"wp-caption-text\">&#8216;Muskoka Moments&#8217; elements would be included in a redesign of Main Street.<\/p><\/div>\n<p><span data-contrast=\"none\">Flex parking is being proposed as part of the streetscape redesign which would allow parking, and also the reconfiguration of the parking spaces for storefront and pedestrian use. Other prominent features involve what\u2019s being referred to as \u2018Muskoka Moments\u2019, which would feature places where people can sit, perhaps enjoy some greenery indigenous to the area, and features such as Muskoka chairs and awnings. <\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:259}\"> <\/span><\/p>\n<p><span data-contrast=\"none\">Ranta and Wang presented a general overview of the options, with option one being a standard asphalt road surface and concrete sidewalks, painted lines at the pedestrian crosswalk in front of civic square, a modified Muskoka feature at the Lorne Street gateway, and concrete pavers at Kent Park. That option would be the most economical at $2 million.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:259}\"> <\/span><\/p>\n<div id=\"attachment_81820\" style=\"width: 760px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-81820\" class=\"wp-image-81820 size-full\" src=\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Option_2.jpg\" alt=\"\" width=\"750\" height=\"562\" srcset=\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Option_2-300x225.jpg 300w, https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Option_2-630x472.jpg 630w, https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Option_2.jpg 750w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><p id=\"caption-attachment-81820\" class=\"wp-caption-text\">Option two would include printed asphalt for the pedestrian crossing across from civic square and imprinted or patterned concrete pavers at civic square.<\/p><\/div>\n<p><span data-contrast=\"none\">A second option was presented at $3 million which would include more \u2018Muskoka Moments\u2019 amenities and some trees, crosswalks would be upgraded from painted lines to imprinted asphalt, Kent Park would have concrete pavers and a kiosk, the Lorne Street gateway would be more enhanced, and the King Street pedestrian walkway and civic square would include patterned concrete pavers, among some of the changes.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559739&quot;:120,&quot;335559740&quot;:259}\"> <\/span><\/p>\n<p><span data-contrast=\"none\">A third option was presented at $4.8 million which would feature a significant Lorne Street gateway, &#8216;Muskoka Moments&#8217; surfaces would be made of concrete pavers, granite pavers would be used for the King Street pedestrian walkway and civic square, Kent Park would include a water feature, and trees with soil cells underneath would line the street beside the flex parking spaces.<\/span><\/p>\n<div id=\"attachment_81823\" style=\"width: 760px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-81823\" class=\"wp-image-81823 size-full\" src=\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Trees.jpg\" alt=\"\" width=\"750\" height=\"562\" srcset=\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Trees-300x225.jpg 300w, https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Trees-630x472.jpg 630w, https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Trees.jpg 750w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><p id=\"caption-attachment-81823\" class=\"wp-caption-text\">The most expensive third option would include trees along Main Street with soil cells underneath to maintain them.<\/p><\/div>\n<p><span data-contrast=\"none\">Ranta also noted that <\/span><span data-contrast=\"none\">council<\/span><span data-contrast=\"none\"> could choose a hybrid design, pulling specific features from each one of the options.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:259}\"> <\/span><\/p>\n<p><span data-contrast=\"none\">Councillor<\/span><span data-contrast=\"none\"> Tim Withey asked that a cost <\/span><span data-contrast=\"none\">break down<\/span><span data-contrast=\"none\"> be included for the various features presented in order to make it easier to pick and choose. He also said he\u2019d like to see more crosswalks along Main Street, possibly by Pharmasave. \u201cWe get people just running across the street at all places, all the time, so I like the feature in front of Town Hall but I think we can use a couple more of those,\u201d he said.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:259}\"> <\/span><\/p>\n<p><span data-contrast=\"none\">Trees were of particular importance for Councillor Bob Stone. \u201cSo here is what happens with these projects all the time. It starts off gorgeous, everybody wants it, and we end up having something wholly mediocre because of budget. This is the showpiece for our town. This is our face to the public, so I feel we need to do it right. Don\u2019t kill the finances in order to do it but &#8230; it is the most important thing in our town when people come to visit and this is what they see. So we need to do it right,\u201d he said. Stone added that soil cells in order to \u201cget large, full-grown trees is imperative. That is what Muskoka is all about so if we can\u2019t have the big trees, like the old town feel, then that\u2019s a real problem for me.\u201d <\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:259}\"> <\/span><\/p>\n<p><span data-contrast=\"none\">He asked if savings could be realized by foregoing the granite features suggested and asked what the difference in price would be. <\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:259}\"> <\/span><\/p>\n<p><span data-contrast=\"none\">Wang said the difference between granite and concrete pavers would be about 50 per cent more for imported granite and about three to four times more for pavers containing local granite.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:259}\"> <\/span><\/p>\n<p><span data-contrast=\"none\">Councillor<\/span><span data-contrast=\"none\"> Nancy <\/span><span data-contrast=\"none\">Alcock<\/span><span data-contrast=\"none\"> echoed some of Stone\u2019s comments. \u201cThis is a showcase for us&#8230; I don\u2019t really want to nickel and dime it because it is going to be a showcase,\u201d she said, adding that she\u2019d like to see the space as pedestrian-oriented as possible. She dismissed option one <\/span><span data-contrast=\"none\">referring<\/span><span data-contrast=\"none\"> to it as &#8220;mediocre&#8221; but said she\u2019d be okay without a \u201cbig, flashy entrance into the town, not a big one for me, so that\u2019s like a whole lot of money [saved], easy.\u201d<\/span><\/p>\n<p><span data-contrast=\"none\">Councillor<\/span><span data-contrast=\"none\"> Jonathan Wiebe was particularly concerned with the functionality of Kent Park. \u201cI think seating is important, being able to just linger in our downtown I think is really important, because right now that space does the opposite, <\/span><span data-contrast=\"none\">it<\/span><span data-contrast=\"none\"> kind of chases you along versus making it a social space that\u2019s designed for everyone.&#8221;<\/span><\/p>\n<p><span data-contrast=\"none\">A public information session on the streetscape options will be held on March 3, 2020, at Partners Hall between 6 and 7:30 p.m. with a formal presentation taking place at 6:15 p.m. Public comments will also be received online from March 4 to 16 at <span style=\"text-decoration: underline;\"><a href=\"https:\/\/www.engagemuskoka.ca\/\">engagemuskoka.ca<\/a><\/span> in order to help the consultants put together a preferred design option.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:259}\"> <\/span><\/p>\n<p><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:259}\"> You can find more information about the downtown streetscape project <span style=\"text-decoration: underline;\"><a href=\"https:\/\/myhuntsville.ca\/streetscape\">here.<\/a><\/span><\/span><\/p>\n<p>&nbsp;<\/p>\n<h5 style=\"text-align: center;\">Don\u2019t miss out on Doppler!<\/h5>\n<p style=\"text-align: center;\"><strong>Sign up <a href=\"https:\/\/doppleronline.ca\/huntsville\/dont-miss-out-on-doppler\/\"><u>here<\/u><\/a> to receive our email digest with links to our most recent stories.<br \/>\nLocal news in your inbox three times per week!<\/strong><\/p>\n<p style=\"text-align: center;\"><broadstreet-zone zone-id=\"45657\" keywords=\"\" soft-keywords=\"true\" zone-alias=\"\"><\/broadstreet-zone>\n<p><span data-contrast=\"none\"> <\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:259}\"> <\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Council was presented with three options for streetscape design finishes for Huntsville\u2019s Main Street as part of the road construction project next spring\u2014each with a different price tag. The [&#8230;]<\/p>\n","protected":false},"author":6,"featured_media":81804,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[10],"tags":[],"class_list":["post-81802","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Main St. redesign options presented to council range from $2M to $4.8M - Huntsville Doppler<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Main St. redesign options presented to council range from $2M to $4.8M - Huntsville Doppler\" \/>\n<meta property=\"og:description\" content=\"Council was presented with three options for streetscape design finishes for Huntsville\u2019s Main Street as part of the road construction project next spring\u2014each with a different price tag. The [...]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/\" \/>\n<meta property=\"og:site_name\" content=\"Huntsville Doppler\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/HuntsvilleDoppler\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-02-27T18:31:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Council_Feb.24.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"750\" \/>\n\t<meta property=\"og:image:height\" content=\"339\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Tamara de la Vega\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Hville_Doppler\" \/>\n<meta name=\"twitter:site\" content=\"@Hville_Doppler\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Tamara de la Vega\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/\"},\"author\":{\"name\":\"Tamara de la Vega\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/2b782f9c7568da44e264b6fc92035e8c\"},\"headline\":\"Main St. redesign options presented to council range from $2M to $4.8M\",\"datePublished\":\"2020-02-27T18:31:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/\"},\"wordCount\":1099,\"commentCount\":11,\"publisher\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#organization\"},\"image\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Council_Feb.24.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/\",\"name\":\"Main St. redesign options presented to council range from $2M to $4.8M - Huntsville Doppler\",\"isPartOf\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Council_Feb.24.jpg\",\"datePublished\":\"2020-02-27T18:31:18+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/#breadcrumb\"},\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/#primaryimage\",\"url\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Council_Feb.24.jpg\",\"contentUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Council_Feb.24.jpg\",\"width\":750,\"height\":339,\"caption\":\"Consultant Les Ranta speaks to council about the various streetscape options for Main Street on Feb. 24, 2020.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/doppleronline.ca\/huntsville\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Main St. redesign options presented to council range from $2M to $4.8M\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#website\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/\",\"name\":\"Huntsville Doppler\",\"description\":\"Read Local\",\"publisher\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/doppleronline.ca\/huntsville\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-CA\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#organization\",\"name\":\"Huntsville Doppler\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg\",\"contentUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg\",\"width\":760,\"height\":212,\"caption\":\"Huntsville Doppler\"},\"image\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/HuntsvilleDoppler\/\",\"https:\/\/x.com\/Hville_Doppler\",\"https:\/\/www.instagram.com\/huntsville_doppler\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/2b782f9c7568da44e264b6fc92035e8c\",\"name\":\"Tamara de la Vega\",\"description\":\"Moved to Huntsville 18 years ago and never left. I'll never really be a local - I still react to blackflies and mosquito bites - but Huntsville is the longest I\u2019ve ever lived anywhere and when your parents are gypsies you live in a lot of places. That's because I love this community. I love the wide open spaces, ancient rocks, lakes and forests. I also love the buzz of Huntsville's core and, well, the wi-fi. I'm a news and chocolate junkie. Respect integrity, talent, kindness, a good story and the taste of an organic tomatoe. I hope you like this site and don't be shy about pitching me a story.\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/author\/tamaradelavega\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Main St. redesign options presented to council range from $2M to $4.8M - Huntsville Doppler","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/","og_locale":"en_US","og_type":"article","og_title":"Main St. redesign options presented to council range from $2M to $4.8M - Huntsville Doppler","og_description":"Council was presented with three options for streetscape design finishes for Huntsville\u2019s Main Street as part of the road construction project next spring\u2014each with a different price tag. The [...]","og_url":"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/","og_site_name":"Huntsville Doppler","article_publisher":"https:\/\/www.facebook.com\/HuntsvilleDoppler\/","article_published_time":"2020-02-27T18:31:18+00:00","og_image":[{"width":750,"height":339,"url":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Council_Feb.24.jpg","type":"image\/jpeg"}],"author":"Tamara de la Vega","twitter_card":"summary_large_image","twitter_creator":"@Hville_Doppler","twitter_site":"@Hville_Doppler","twitter_misc":{"Written by":"Tamara de la Vega","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/#article","isPartOf":{"@id":"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/"},"author":{"name":"Tamara de la Vega","@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/2b782f9c7568da44e264b6fc92035e8c"},"headline":"Main St. redesign options presented to council range from $2M to $4.8M","datePublished":"2020-02-27T18:31:18+00:00","mainEntityOfPage":{"@id":"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/"},"wordCount":1099,"commentCount":11,"publisher":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#organization"},"image":{"@id":"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/#primaryimage"},"thumbnailUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Council_Feb.24.jpg","articleSection":["News"],"inLanguage":"en-CA","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/","url":"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/","name":"Main St. redesign options presented to council range from $2M to $4.8M - Huntsville Doppler","isPartOf":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#website"},"primaryImageOfPage":{"@id":"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/#primaryimage"},"image":{"@id":"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/#primaryimage"},"thumbnailUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Council_Feb.24.jpg","datePublished":"2020-02-27T18:31:18+00:00","breadcrumb":{"@id":"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/#breadcrumb"},"inLanguage":"en-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/"]}]},{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/#primaryimage","url":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Council_Feb.24.jpg","contentUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2020\/02\/Council_Feb.24.jpg","width":750,"height":339,"caption":"Consultant Les Ranta speaks to council about the various streetscape options for Main Street on Feb. 24, 2020."},{"@type":"BreadcrumbList","@id":"https:\/\/doppleronline.ca\/huntsville\/main-st-redesign-options-presented-to-council-range-from-2m-to-4-8m\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/doppleronline.ca\/huntsville\/"},{"@type":"ListItem","position":2,"name":"Main St. redesign options presented to council range from $2M to $4.8M"}]},{"@type":"WebSite","@id":"https:\/\/doppleronline.ca\/huntsville\/#website","url":"https:\/\/doppleronline.ca\/huntsville\/","name":"Huntsville Doppler","description":"Read Local","publisher":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/doppleronline.ca\/huntsville\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-CA"},{"@type":"Organization","@id":"https:\/\/doppleronline.ca\/huntsville\/#organization","name":"Huntsville Doppler","url":"https:\/\/doppleronline.ca\/huntsville\/","logo":{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/","url":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg","contentUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg","width":760,"height":212,"caption":"Huntsville Doppler"},"image":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/HuntsvilleDoppler\/","https:\/\/x.com\/Hville_Doppler","https:\/\/www.instagram.com\/huntsville_doppler\/"]},{"@type":"Person","@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/2b782f9c7568da44e264b6fc92035e8c","name":"Tamara de la Vega","description":"Moved to Huntsville 18 years ago and never left. I'll never really be a local - I still react to blackflies and mosquito bites - but Huntsville is the longest I\u2019ve ever lived anywhere and when your parents are gypsies you live in a lot of places. That's because I love this community. I love the wide open spaces, ancient rocks, lakes and forests. I also love the buzz of Huntsville's core and, well, the wi-fi. I'm a news and chocolate junkie. Respect integrity, talent, kindness, a good story and the taste of an organic tomatoe. I hope you like this site and don't be shy about pitching me a story.","url":"https:\/\/doppleronline.ca\/huntsville\/author\/tamaradelavega\/"}]}},"_links":{"self":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/posts\/81802","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/comments?post=81802"}],"version-history":[{"count":0,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/posts\/81802\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/media\/81804"}],"wp:attachment":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/media?parent=81802"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/categories?post=81802"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/tags?post=81802"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}