{"id":159570,"date":"2024-08-23T12:40:18","date_gmt":"2024-08-23T16:40:18","guid":{"rendered":"https:\/\/doppleronline.ca\/rwddev\/?p=159570"},"modified":"2024-08-23T12:40:20","modified_gmt":"2024-08-23T16:40:20","slug":"town-of-huntsville-provides-a-capital-roads-work-update","status":"publish","type":"post","link":"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/","title":{"rendered":"Town of Huntsville provides a capital roads work update"},"content":{"rendered":"<div style=\"float: left; margin-right: 14px;\"><strong><broadstreet-zone zone-id=\"45658\" keywords=\"\" soft-keywords=\"true\" zone-alias=\"\"><\/broadstreet-zone><\/strong><\/div>\n\n\n\n<p><em>From the Town of Huntsville<\/em><\/p>\n\n\n\n<p>As we near the end of summer, many projects outlined in the Town\u2019s\u00a0<a href=\"https:\/\/www.huntsville.ca\/en\/news\/media-release-huntsville-prepares-for-2024-road-sidewalk-and-bridge-capital-construction-program.aspx\" target=\"_blank\" rel=\"noreferrer noopener\"><span style=\"text-decoration: underline;\">2024 Capital Construction Program<\/span><\/a>\u00a0have been completed and roads are being re-opened. Please see the below project updates:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Minerva Street Reconstruction\u00a0<\/strong>(Centre Street to West Street) \u2013 Re-opened on August 21, 2024 &#8211; Reconstruction works are nearing completion, including storm sewers, sidewalks, and road resurfacing. *Please note that, now that Minerva has been re-opened following construction,\u00a0<strong>the temporary Transit Stop location has been moved back to its original location in front of the Huntsville Public Library.<\/strong><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Silver Street<\/strong>\u00a0(West Road to Thunder Bridge Road) \u2013 Completed &#8211; Road work included new asphalt road surface along with ditching.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>East Elliot Street<\/strong>\u00a0(Yonge Street to Wilmott Street) \u2013 Re-Opened as of August 21, 2024 &#8211; Road work is completed, including new asphalt road surface, catch basins, storm pipes and ditching.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Kitchen Road South<\/strong>\u00a0(Main Street West to Cairns Crescent) \u2013 Completed \u2013 Road work included road base patching and new asphalt surface.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Dara Howell Way Streetlight Replacement<\/strong>\u00a0\u2013 Completed \u2013 Work included removal and replacement of existing streetlights.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>High Float and Gravel Work\u00a0<\/strong>on area roads has been completed.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Slurry Seal Work\u00a0<\/strong>on area roads is expected to start at the end of August.<\/li>\n<\/ul>\n\n\n\n<p>For full details on the 2024 Capital Project Program and timing of construction, please visit\u00a0<a href=\"https:\/\/www.huntsville.ca\/Roads\" target=\"_blank\" rel=\"noreferrer noopener\"><strong><span style=\"text-decoration: underline;\">huntsville.ca\/Roads<\/span><\/strong><\/a>.\u00a0<\/p>\n\n\n<h5 style=\"text-align: center;\">Don\u2019t miss out on Doppler!<\/h5>\n<p style=\"text-align: center;\"><strong>Sign up <a href=\"https:\/\/doppleronline.ca\/huntsville\/dont-miss-out-on-doppler\/\"><u>here<\/u><\/a> to receive our email digest with links to our most recent stories.<br \/>\nLocal news in your inbox so you don&#8217;t miss anything!<\/strong><\/p>\n<p style=\"text-align: center;\"><a style=\"background: #5cb85c url('https:\/\/d1iczxrky3cnb2.cloudfront.net\/red_logo.png') no-repeat 37px; color: #fff; text-decoration: none; font-family: Verdana,sans-serif; display: inline-block; font-size: 16px; padding: 15px 38px; padding-left: 75px; -webkit-border-radius: 2px; -moz-border-radius: 2px; border-radius: 2px; box-shadow: 0 1px 0 0 #1f5a89; text-shadow: 0 1px rgba(0, 0, 0, 0.3);\" href=\"https:\/\/donorbox.org\/support-huntsville-doppler\">Click here to support local news<\/a><\/p>\n<p style=\"text-align: center;\"><broadstreet-zone zone-id=\"45657\" keywords=\"\" soft-keywords=\"true\" zone-alias=\"\"><\/broadstreet-zone>\n","protected":false},"excerpt":{"rendered":"<p>From the Town of Huntsville As we near the end of summer, many projects outlined in the Town\u2019s\u00a02024 Capital Construction Program\u00a0have been completed and roads are being re-opened. Please see [&#8230;]<\/p>\n","protected":false},"author":1904,"featured_media":159571,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[10],"tags":[],"class_list":["post-159570","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Town of Huntsville provides a capital roads work update - Huntsville Doppler<\/title>\n<meta name=\"description\" content=\"Town of Huntsville has issued a capital roads construction update as we near the end of summer and many 2024 projects are completed.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Town of Huntsville provides a capital roads work update - Huntsville Doppler\" \/>\n<meta property=\"og:description\" content=\"Town of Huntsville has issued a capital roads construction update as we near the end of summer and many 2024 projects are completed.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/\" \/>\n<meta property=\"og:site_name\" content=\"Huntsville Doppler\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/HuntsvilleDoppler\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-08-23T16:40:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-23T16:40:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/08\/Minerva-Post-Construction.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"730\" \/>\n\t<meta property=\"og:image:height\" content=\"416\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Doppler Online\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Hville_Doppler\" \/>\n<meta name=\"twitter:site\" content=\"@Hville_Doppler\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Doppler Online\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/\"},\"author\":{\"name\":\"Doppler Online\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/3e6b0695dcb78273e5a4854699a12938\"},\"headline\":\"Town of Huntsville provides a capital roads work update\",\"datePublished\":\"2024-08-23T16:40:18+00:00\",\"dateModified\":\"2024-08-23T16:40:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/\"},\"wordCount\":225,\"commentCount\":3,\"publisher\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#organization\"},\"image\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/08\/Minerva-Post-Construction.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/\",\"name\":\"Town of Huntsville provides a capital roads work update - Huntsville Doppler\",\"isPartOf\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/08\/Minerva-Post-Construction.jpg\",\"datePublished\":\"2024-08-23T16:40:18+00:00\",\"dateModified\":\"2024-08-23T16:40:20+00:00\",\"description\":\"Town of Huntsville has issued a capital roads construction update as we near the end of summer and many 2024 projects are completed.\",\"breadcrumb\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/#breadcrumb\"},\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/#primaryimage\",\"url\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/08\/Minerva-Post-Construction.jpg\",\"contentUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/08\/Minerva-Post-Construction.jpg\",\"width\":730,\"height\":416,\"caption\":\"Minerva Street reconstruction work is nearing completion and the road has re-opened as of August 21. Please note that the bus stop will resume service at its previous location. (Photo: Town of Huntsville)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/doppleronline.ca\/huntsville\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Town of Huntsville provides a capital roads work update\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#website\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/\",\"name\":\"Huntsville Doppler\",\"description\":\"Read Local\",\"publisher\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/doppleronline.ca\/huntsville\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-CA\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#organization\",\"name\":\"Huntsville Doppler\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg\",\"contentUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg\",\"width\":760,\"height\":212,\"caption\":\"Huntsville Doppler\"},\"image\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/HuntsvilleDoppler\/\",\"https:\/\/x.com\/Hville_Doppler\",\"https:\/\/www.instagram.com\/huntsville_doppler\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/3e6b0695dcb78273e5a4854699a12938\",\"name\":\"Doppler Online\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/author\/doppler-online\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Town of Huntsville provides a capital roads work update - Huntsville Doppler","description":"Town of Huntsville has issued a capital roads construction update as we near the end of summer and many 2024 projects are completed.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/","og_locale":"en_US","og_type":"article","og_title":"Town of Huntsville provides a capital roads work update - Huntsville Doppler","og_description":"Town of Huntsville has issued a capital roads construction update as we near the end of summer and many 2024 projects are completed.","og_url":"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/","og_site_name":"Huntsville Doppler","article_publisher":"https:\/\/www.facebook.com\/HuntsvilleDoppler\/","article_published_time":"2024-08-23T16:40:18+00:00","article_modified_time":"2024-08-23T16:40:20+00:00","og_image":[{"width":730,"height":416,"url":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/08\/Minerva-Post-Construction.jpg","type":"image\/jpeg"}],"author":"Doppler Online","twitter_card":"summary_large_image","twitter_creator":"@Hville_Doppler","twitter_site":"@Hville_Doppler","twitter_misc":{"Written by":"Doppler Online","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/#article","isPartOf":{"@id":"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/"},"author":{"name":"Doppler Online","@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/3e6b0695dcb78273e5a4854699a12938"},"headline":"Town of Huntsville provides a capital roads work update","datePublished":"2024-08-23T16:40:18+00:00","dateModified":"2024-08-23T16:40:20+00:00","mainEntityOfPage":{"@id":"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/"},"wordCount":225,"commentCount":3,"publisher":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#organization"},"image":{"@id":"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/#primaryimage"},"thumbnailUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/08\/Minerva-Post-Construction.jpg","articleSection":["News"],"inLanguage":"en-CA","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/","url":"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/","name":"Town of Huntsville provides a capital roads work update - Huntsville Doppler","isPartOf":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#website"},"primaryImageOfPage":{"@id":"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/#primaryimage"},"image":{"@id":"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/#primaryimage"},"thumbnailUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/08\/Minerva-Post-Construction.jpg","datePublished":"2024-08-23T16:40:18+00:00","dateModified":"2024-08-23T16:40:20+00:00","description":"Town of Huntsville has issued a capital roads construction update as we near the end of summer and many 2024 projects are completed.","breadcrumb":{"@id":"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/#breadcrumb"},"inLanguage":"en-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/"]}]},{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/#primaryimage","url":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/08\/Minerva-Post-Construction.jpg","contentUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/08\/Minerva-Post-Construction.jpg","width":730,"height":416,"caption":"Minerva Street reconstruction work is nearing completion and the road has re-opened as of August 21. Please note that the bus stop will resume service at its previous location. (Photo: Town of Huntsville)"},{"@type":"BreadcrumbList","@id":"https:\/\/doppleronline.ca\/huntsville\/town-of-huntsville-provides-a-capital-roads-work-update\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/doppleronline.ca\/huntsville\/"},{"@type":"ListItem","position":2,"name":"Town of Huntsville provides a capital roads work update"}]},{"@type":"WebSite","@id":"https:\/\/doppleronline.ca\/huntsville\/#website","url":"https:\/\/doppleronline.ca\/huntsville\/","name":"Huntsville Doppler","description":"Read Local","publisher":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/doppleronline.ca\/huntsville\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-CA"},{"@type":"Organization","@id":"https:\/\/doppleronline.ca\/huntsville\/#organization","name":"Huntsville Doppler","url":"https:\/\/doppleronline.ca\/huntsville\/","logo":{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/","url":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg","contentUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg","width":760,"height":212,"caption":"Huntsville Doppler"},"image":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/HuntsvilleDoppler\/","https:\/\/x.com\/Hville_Doppler","https:\/\/www.instagram.com\/huntsville_doppler\/"]},{"@type":"Person","@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/3e6b0695dcb78273e5a4854699a12938","name":"Doppler Online","url":"https:\/\/doppleronline.ca\/huntsville\/author\/doppler-online\/"}]}},"_links":{"self":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/posts\/159570","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/users\/1904"}],"replies":[{"embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/comments?post=159570"}],"version-history":[{"count":0,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/posts\/159570\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/media\/159571"}],"wp:attachment":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/media?parent=159570"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/categories?post=159570"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/tags?post=159570"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}