{"id":153228,"date":"2024-04-19T10:43:36","date_gmt":"2024-04-19T14:43:36","guid":{"rendered":"https:\/\/doppleronline.ca\/rwddev\/?p=153228"},"modified":"2024-04-19T10:43:43","modified_gmt":"2024-04-19T14:43:43","slug":"downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22","status":"publish","type":"post","link":"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/","title":{"rendered":"Downtown sidewalk repair work begins in Huntsville on April 22"},"content":{"rendered":"\n<p><em>From the Town of Huntsville<\/em><\/p>\n\n\n\n<p>Required sidewalk repair work on Main St. in downtown Huntsville, including replacement of some of the sidewalk panels installed during the Diggin\u2019 Downtown construction project, will commence the week of April 22, 2024. There will be impacts to traffic, parking, and pedestrian access in the downtown area.<\/p>\n\n\n<div style=\"float: left; margin-right: 14px;\"><strong><broadstreet-zone zone-id=\"45658\" keywords=\"\" soft-keywords=\"true\" zone-alias=\"\"><\/broadstreet-zone><\/strong><\/div>\n\n\n\n<p>In order to complete this work, Main St. will require temporary single-lane closures throughout the day and slower commute times can be expected. Street parking on Main St. will not be available in the construction area. Motorists are encouraged to make use of nearby public parking lots (including Canada Summit Centre) and side streets (where applicable) \u2013 please see Town of Huntsville Parking Map. Note that the parking lot on High St. will have reduced capacity due to construction equipment staging in the southeast corner. Pedestrians are encouraged to note and follow the posted signage to ensure safety.<\/p>\n\n\n\n<p>The sidewalk repair work is expected to take 2-3 weeks and is scheduled to be completed by the middle of May.<\/p>\n\n\n\n<p>The Town, District, and contractor will work together to ensure businesses and residents in the area are aware of timelines, parking impacts, and maintaining pedestrian access.\u00a0The District has also coordinated with EMS and the School Board regarding impacts to transportation routes.<\/p>\n\n\n\n<p>The Diggin\u2019 Downtown project is in the warranty period. Sidewalk repair works will be completed under the original contract, with no additional cost to the taxpayer.<\/p>\n\n\n\n<p>For the latest updates on construction and other traffic disruptions, please subscribe to our newsfeed at\u00a0<a href=\"https:\/\/www.huntsville.ca\/Modules\/News\/en\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Huntsville.ca<\/strong><\/a>\u00a0or follow the Town on\u00a0<a href=\"https:\/\/www.facebook.com\/townofhuntsville\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Facebook<\/strong><\/a>\u00a0or\u00a0<a href=\"https:\/\/twitter.com\/townhuntsville\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>X (formerly Twitter)<\/strong><\/a>.<\/p>\n\n\n<h5 style=\"text-align: center;\">Don\u2019t miss out on Doppler!<\/h5>\n<p style=\"text-align: center;\"><strong>Sign up <a href=\"https:\/\/doppleronline.ca\/huntsville\/dont-miss-out-on-doppler\/\"><u>here<\/u><\/a> to receive our email digest with links to our most recent stories.<br \/>\nLocal news in your inbox so you don&#8217;t miss anything!<\/strong><\/p>\n<p style=\"text-align: center;\"><a style=\"background: #5cb85c url('https:\/\/d1iczxrky3cnb2.cloudfront.net\/red_logo.png') no-repeat 37px; color: #fff; text-decoration: none; font-family: Verdana,sans-serif; display: inline-block; font-size: 16px; padding: 15px 38px; padding-left: 75px; -webkit-border-radius: 2px; -moz-border-radius: 2px; border-radius: 2px; box-shadow: 0 1px 0 0 #1f5a89; text-shadow: 0 1px rgba(0, 0, 0, 0.3);\" href=\"https:\/\/donorbox.org\/support-huntsville-doppler\">Click here to support local news<\/a><\/p>\n<p style=\"text-align: center;\"><broadstreet-zone zone-id=\"45657\" keywords=\"\" soft-keywords=\"true\" zone-alias=\"\"><\/broadstreet-zone>\n","protected":false},"excerpt":{"rendered":"<p>From the Town of Huntsville Required sidewalk repair work on Main St. in downtown Huntsville, including replacement of some of the sidewalk panels installed during the Diggin\u2019 Downtown construction project, [&#8230;]<\/p>\n","protected":false},"author":1904,"featured_media":153229,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[10],"tags":[],"class_list":["post-153228","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Downtown sidewalk repair work begins in Huntsville on April 22 - Huntsville Doppler<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Downtown sidewalk repair work begins in Huntsville on April 22 - Huntsville Doppler\" \/>\n<meta property=\"og:description\" content=\"From the Town of Huntsville Required sidewalk repair work on Main St. in downtown Huntsville, including replacement of some of the sidewalk panels installed during the Diggin\u2019 Downtown construction project, [...]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/\" \/>\n<meta property=\"og:site_name\" content=\"Huntsville Doppler\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/HuntsvilleDoppler\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-19T14:43:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-04-19T14:43:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/04\/Parking-Downtown-Map-ED.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"750\" \/>\n\t<meta property=\"og:image:height\" content=\"394\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Doppler Online\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Hville_Doppler\" \/>\n<meta name=\"twitter:site\" content=\"@Hville_Doppler\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Doppler Online\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/\"},\"author\":{\"name\":\"Doppler Online\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/3e6b0695dcb78273e5a4854699a12938\"},\"headline\":\"Downtown sidewalk repair work begins in Huntsville on April 22\",\"datePublished\":\"2024-04-19T14:43:36+00:00\",\"dateModified\":\"2024-04-19T14:43:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/\"},\"wordCount\":273,\"commentCount\":4,\"publisher\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#organization\"},\"image\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/04\/Parking-Downtown-Map-ED.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/\",\"name\":\"Downtown sidewalk repair work begins in Huntsville on April 22 - Huntsville Doppler\",\"isPartOf\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/04\/Parking-Downtown-Map-ED.jpg\",\"datePublished\":\"2024-04-19T14:43:36+00:00\",\"dateModified\":\"2024-04-19T14:43:43+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/#breadcrumb\"},\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/#primaryimage\",\"url\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/04\/Parking-Downtown-Map-ED.jpg\",\"contentUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/04\/Parking-Downtown-Map-ED.jpg\",\"width\":750,\"height\":394},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/doppleronline.ca\/huntsville\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Downtown sidewalk repair work begins in Huntsville on April 22\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#website\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/\",\"name\":\"Huntsville Doppler\",\"description\":\"Read Local\",\"publisher\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/doppleronline.ca\/huntsville\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-CA\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#organization\",\"name\":\"Huntsville Doppler\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg\",\"contentUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg\",\"width\":760,\"height\":212,\"caption\":\"Huntsville Doppler\"},\"image\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/HuntsvilleDoppler\/\",\"https:\/\/x.com\/Hville_Doppler\",\"https:\/\/www.instagram.com\/huntsville_doppler\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/3e6b0695dcb78273e5a4854699a12938\",\"name\":\"Doppler Online\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/author\/doppler-online\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Downtown sidewalk repair work begins in Huntsville on April 22 - Huntsville Doppler","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/","og_locale":"en_US","og_type":"article","og_title":"Downtown sidewalk repair work begins in Huntsville on April 22 - Huntsville Doppler","og_description":"From the Town of Huntsville Required sidewalk repair work on Main St. in downtown Huntsville, including replacement of some of the sidewalk panels installed during the Diggin\u2019 Downtown construction project, [...]","og_url":"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/","og_site_name":"Huntsville Doppler","article_publisher":"https:\/\/www.facebook.com\/HuntsvilleDoppler\/","article_published_time":"2024-04-19T14:43:36+00:00","article_modified_time":"2024-04-19T14:43:43+00:00","og_image":[{"width":750,"height":394,"url":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/04\/Parking-Downtown-Map-ED.jpg","type":"image\/jpeg"}],"author":"Doppler Online","twitter_card":"summary_large_image","twitter_creator":"@Hville_Doppler","twitter_site":"@Hville_Doppler","twitter_misc":{"Written by":"Doppler Online","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/#article","isPartOf":{"@id":"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/"},"author":{"name":"Doppler Online","@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/3e6b0695dcb78273e5a4854699a12938"},"headline":"Downtown sidewalk repair work begins in Huntsville on April 22","datePublished":"2024-04-19T14:43:36+00:00","dateModified":"2024-04-19T14:43:43+00:00","mainEntityOfPage":{"@id":"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/"},"wordCount":273,"commentCount":4,"publisher":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#organization"},"image":{"@id":"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/#primaryimage"},"thumbnailUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/04\/Parking-Downtown-Map-ED.jpg","articleSection":["News"],"inLanguage":"en-CA","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/","url":"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/","name":"Downtown sidewalk repair work begins in Huntsville on April 22 - Huntsville Doppler","isPartOf":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#website"},"primaryImageOfPage":{"@id":"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/#primaryimage"},"image":{"@id":"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/#primaryimage"},"thumbnailUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/04\/Parking-Downtown-Map-ED.jpg","datePublished":"2024-04-19T14:43:36+00:00","dateModified":"2024-04-19T14:43:43+00:00","breadcrumb":{"@id":"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/#breadcrumb"},"inLanguage":"en-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/"]}]},{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/#primaryimage","url":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/04\/Parking-Downtown-Map-ED.jpg","contentUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2024\/04\/Parking-Downtown-Map-ED.jpg","width":750,"height":394},{"@type":"BreadcrumbList","@id":"https:\/\/doppleronline.ca\/huntsville\/downtown-sidewalk-repair-work-begins-in-huntsville-on-april-22\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/doppleronline.ca\/huntsville\/"},{"@type":"ListItem","position":2,"name":"Downtown sidewalk repair work begins in Huntsville on April 22"}]},{"@type":"WebSite","@id":"https:\/\/doppleronline.ca\/huntsville\/#website","url":"https:\/\/doppleronline.ca\/huntsville\/","name":"Huntsville Doppler","description":"Read Local","publisher":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/doppleronline.ca\/huntsville\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-CA"},{"@type":"Organization","@id":"https:\/\/doppleronline.ca\/huntsville\/#organization","name":"Huntsville Doppler","url":"https:\/\/doppleronline.ca\/huntsville\/","logo":{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/","url":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg","contentUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg","width":760,"height":212,"caption":"Huntsville Doppler"},"image":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/HuntsvilleDoppler\/","https:\/\/x.com\/Hville_Doppler","https:\/\/www.instagram.com\/huntsville_doppler\/"]},{"@type":"Person","@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/3e6b0695dcb78273e5a4854699a12938","name":"Doppler Online","url":"https:\/\/doppleronline.ca\/huntsville\/author\/doppler-online\/"}]}},"_links":{"self":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/posts\/153228","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/users\/1904"}],"replies":[{"embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/comments?post=153228"}],"version-history":[{"count":0,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/posts\/153228\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/media\/153229"}],"wp:attachment":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/media?parent=153228"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/categories?post=153228"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/tags?post=153228"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}