{"id":107962,"date":"2022-01-20T14:46:52","date_gmt":"2022-01-20T19:46:52","guid":{"rendered":"https:\/\/huntsville.dopperonline.ca\/?p=107962"},"modified":"2022-01-20T14:46:53","modified_gmt":"2022-01-20T19:46:53","slug":"etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring","status":"publish","type":"post","link":"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/","title":{"rendered":"Etwell Rd culvert replacement a priority to prevent failure this spring"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<p>Etwell Rd will be fully closed just north of Jarvies Rd until mid-February for a twin culvert replacement at Wallington Creek. <\/p>\n\n\n\n<p>The work is necessary now to prevent a collapse in the spring, said the District&#8217;s director of engineering and transportation, Mark Misko, in a District engineering and public works committee meeting on Jan. 19.<\/p>\n\n\n\n<p>Access to properties will be maintained via the north or south end of Etwell Road during construction, resulting in about a 25-minute detour for some residents. There will be no EMS through-access.<\/p>\n\n\n<div style=\"float: left; margin-right: 14px;\"><strong><broadstreet-zone zone-id=\"45658\" keywords=\"\" soft-keywords=\"true\" zone-alias=\"\"><\/broadstreet-zone><\/strong><\/div>\n\n\n\n<p>&#8220;District patrol staff noticed that we were getting some material loss in the roadway in the area of these culverts and subsequently followed up with a full structural inspection,&#8221; said Misko. &#8220;The culverts are essentially on the verge of collapsing and failing.&#8221;&nbsp;<\/p>\n\n\n\n<p>Although winter isn&#8217;t the ideal time for the work to be completed, Misko acknowledged, &#8220;holding off on replacing these could put us in a worse situation in the spring. If these culverts would have failed completely, we\u2019d be managing not only high water levels, we\u2019d also be managing a road closure at the same time, so the decision was made to look to replace these, not as an emergency\u2026it\u2019s a planned closure for about three weeks with a 25-minute detour.&#8221;&nbsp;<\/p>\n\n\n\n<p>He added that the issue with the culverts isn&#8217;t one of capacity, but rather their structural integrity.<\/p>\n\n\n\n<p>Fidelity Engineering and Construction was selected to complete the work via an RFQ (Request For Quote) process. District staff did not go out for full tender for the project due to the urgency of the repairs, but rather made a request for pricing. The company has not been hired by the District previously, but has completed projects within Muskoka for the Ministry of Transportation, noted Misko.<\/p>\n\n\n\n<p>Crews were on site as of Tuesday, Jan. 18, he added.<\/p>\n\n\n\n<p>Councillor Rick Maloney wanted assurances there would be warranties on the work, given that it&#8217;s being done in the winter.<\/p>\n\n\n\n<p>&#8220;I agree with you,&#8221; replied Misko. &#8220;Winter is not an ideal time to be doing construction work\u2026 There are some construction techniques we can use\u2026there wasn\u2019t really a concern with compaction in this area. Roadworks have a standard one-year warranty\u2026 so we do have assurances that if there\u2019s any deficiencies in the work this spring due to the timing of the work, that will get rectified when they are identified.&#8221;<\/p>\n\n\n\n<p>Councillor Phil Harding asked if this culvert has somehow fallen through the cracks in terms of inspection. &#8220;I thought we were putting on a more regimented routine inspection schedule&#8221; as a result of the culvert collapse on Hwy 169 in 2015, he said. &#8220;It seems this is another culvert that has somewhat been missed in a needs priority survey. I\u2019m just wondering how we get to it as an emergency\u2026 we\u2019re not inspecting culverts on an annual basis to be a little bit more proactive.&#8221;<\/p>\n\n\n\n<p>Following that collapse, District staff did conduct inspections, said Misko, with priority on larger pipes &#8220;because the consequences of failure are a lot more significant than some of our smaller culverts.&#8221;<\/p>\n\n\n\n<p>The Wallington Creek twin culverts are among the smaller-sized inventory that staff are working their way through. &#8220;There\u2019s well over 1,000 of these, I think we\u2019ve got about 3,000\u2026,&#8221; said Misko, adding that if staff notice an issue like material loss on the roadway or a small sinkhole starting to form, it gets moved up the chain for analysis.<\/p>\n\n\n\n<p>Councillor Brian Thompson wondered about the impact of an increasing number of extreme weather events. &#8220;So something that might have passed the test two years ago has been further compromised simply because of the incredible weather events we\u2019ve been experiencing lately. I\u2019m anticipating this might be an ongoing problem where you\u2019re going to have emergency situations crop up that you had not anticipated.&#8221;<\/p>\n\n\n\n<p>Misko replied: &#8220;We\u2019re seeing more intense weather events. We\u2019re doing our best to constantly assess these culverts and analyze them from a capacity perspective. Will we catch all of them? I doubt that. There\u2019s always going to be a few that we may get a storm and there\u2019s a beaver dam or something else that exacerbates that culvert\u2019s capacity and there will be some reactive measures that we\u2019ll have to take with respect to how we manage this. We are trying to be as proactive as possible with our culvert appraisals and qualifying our inventory and making sure that we can avoid as much of this as we can.&#8221;<\/p>\n\n\n\n<p>He added that the Wallington Creek culverts had simply come to the end of their life. &#8220;The culvert\u2019s been performing to date, it just came to end of life and started to deteriorate based on the age of the structure, so we identified that and looked to replace it immediately&#8230; <\/p>\n\n\n\n<p>&#8220;It\u2019s tough to predict what the weather\u2019s going to do into next year and in future years. We are seeing that type of trend so we are trying our best to make sure that the information we have at hand will help us avoid that down the future.&#8221;<\/p>\n\n\n\n<p>Committee approved a motion to adjust the capital budget be amended to help in replacement of twin culverts as noted in the first table below, and that the source of funding be adjusted per the second table.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"342\" src=\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/Screenshot-2022-01-20-14.29.26.png\" alt=\"\" class=\"wp-image-108297\" srcset=\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/Screenshot-2022-01-20-14.29.26-300x137.png 300w, https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/Screenshot-2022-01-20-14.29.26-630x287.png 630w, https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/Screenshot-2022-01-20-14.29.26.png 750w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"165\" src=\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/Screenshot-2022-01-20-14.31.12.png\" alt=\"\" class=\"wp-image-108298\" srcset=\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/Screenshot-2022-01-20-14.31.12-300x66.png 300w, https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/Screenshot-2022-01-20-14.31.12-630x139.png 630w, https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/Screenshot-2022-01-20-14.31.12.png 750w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><\/figure><\/div>\n\n\n\n<p>The staff report is <span style=\"text-decoration: underline;\"><a href=\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/PW-1-2022-2-Notice-of-Emergency-Purchase-Wallington-Creek.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">here<\/a><\/span>.<\/p>\n\n\n\n<p>See the road closure notice <span style=\"text-decoration: underline;\"><a href=\"https:\/\/www.huntsville.ca\/Modules\/News\/index.aspx?newsId=1423166a-a432-41eb-954f-039e59975ddf\" target=\"_blank\" rel=\"noreferrer noopener\">here<\/a><\/span>.<\/p>\n\n\n<h5 style=\"text-align: center;\">Don\u2019t miss out on Doppler!<\/h5>\n<p style=\"text-align: center;\"><strong>Sign up <a href=\"https:\/\/doppleronline.ca\/huntsville\/dont-miss-out-on-doppler\/\"><u>here<\/u><\/a> to receive our email digest with links to our most recent stories.<br \/>\nLocal news in your inbox so you don&#8217;t miss anything!<\/strong><\/p>\n<p style=\"text-align: center;\"><a style=\"background: #5cb85c url('https:\/\/d1iczxrky3cnb2.cloudfront.net\/red_logo.png') no-repeat 37px; color: #fff; text-decoration: none; font-family: Verdana,sans-serif; display: inline-block; font-size: 16px; padding: 15px 38px; padding-left: 75px; -webkit-border-radius: 2px; -moz-border-radius: 2px; border-radius: 2px; box-shadow: 0 1px 0 0 #1f5a89; text-shadow: 0 1px rgba(0, 0, 0, 0.3);\" href=\"https:\/\/donorbox.org\/support-huntsville-doppler\">Click here to support local news<\/a><\/p>\n<p style=\"text-align: center;\"><broadstreet-zone zone-id=\"45657\" keywords=\"\" soft-keywords=\"true\" zone-alias=\"\"><\/broadstreet-zone>\n","protected":false},"excerpt":{"rendered":"<p>Etwell Rd will be fully closed just north of Jarvies Rd until mid-February for a twin culvert replacement at Wallington Creek. The work is necessary now to prevent a collapse [&#8230;]<\/p>\n","protected":false},"author":1903,"featured_media":108295,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[10],"tags":[],"class_list":["post-107962","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Etwell Rd culvert replacement a priority to prevent failure this spring - Huntsville Doppler<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Etwell Rd culvert replacement a priority to prevent failure this spring - Huntsville Doppler\" \/>\n<meta property=\"og:description\" content=\"Etwell Rd will be fully closed just north of Jarvies Rd until mid-February for a twin culvert replacement at Wallington Creek. The work is necessary now to prevent a collapse [...]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/\" \/>\n<meta property=\"og:site_name\" content=\"Huntsville Doppler\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/HuntsvilleDoppler\/\" \/>\n<meta property=\"article:published_time\" content=\"2022-01-20T19:46:52+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-01-20T19:46:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/JMJtik33-Screenshot-2022-01-20-14.03.25.png\" \/>\n\t<meta property=\"og:image:width\" content=\"750\" \/>\n\t<meta property=\"og:image:height\" content=\"361\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Dawn Huddlestone\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Hville_Doppler\" \/>\n<meta name=\"twitter:site\" content=\"@Hville_Doppler\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Dawn Huddlestone\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/\"},\"author\":{\"name\":\"Dawn Huddlestone\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/d5d919046b2224f1b6b8bc9c585ff4a3\"},\"headline\":\"Etwell Rd culvert replacement a priority to prevent failure this spring\",\"datePublished\":\"2022-01-20T19:46:52+00:00\",\"dateModified\":\"2022-01-20T19:46:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/\"},\"wordCount\":920,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#organization\"},\"image\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/JMJtik33-Screenshot-2022-01-20-14.03.25.png\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/\",\"name\":\"Etwell Rd culvert replacement a priority to prevent failure this spring - Huntsville Doppler\",\"isPartOf\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/JMJtik33-Screenshot-2022-01-20-14.03.25.png\",\"datePublished\":\"2022-01-20T19:46:52+00:00\",\"dateModified\":\"2022-01-20T19:46:53+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/#breadcrumb\"},\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/#primaryimage\",\"url\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/JMJtik33-Screenshot-2022-01-20-14.03.25.png\",\"contentUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/JMJtik33-Screenshot-2022-01-20-14.03.25.png\",\"width\":750,\"height\":361},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/doppleronline.ca\/huntsville\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Etwell Rd culvert replacement a priority to prevent failure this spring\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#website\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/\",\"name\":\"Huntsville Doppler\",\"description\":\"Read Local\",\"publisher\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/doppleronline.ca\/huntsville\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-CA\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#organization\",\"name\":\"Huntsville Doppler\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg\",\"contentUrl\":\"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg\",\"width\":760,\"height\":212,\"caption\":\"Huntsville Doppler\"},\"image\":{\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/HuntsvilleDoppler\/\",\"https:\/\/x.com\/Hville_Doppler\",\"https:\/\/www.instagram.com\/huntsville_doppler\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/d5d919046b2224f1b6b8bc9c585ff4a3\",\"name\":\"Dawn Huddlestone\",\"url\":\"https:\/\/doppleronline.ca\/huntsville\/author\/dawn\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Etwell Rd culvert replacement a priority to prevent failure this spring - Huntsville Doppler","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/","og_locale":"en_US","og_type":"article","og_title":"Etwell Rd culvert replacement a priority to prevent failure this spring - Huntsville Doppler","og_description":"Etwell Rd will be fully closed just north of Jarvies Rd until mid-February for a twin culvert replacement at Wallington Creek. The work is necessary now to prevent a collapse [...]","og_url":"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/","og_site_name":"Huntsville Doppler","article_publisher":"https:\/\/www.facebook.com\/HuntsvilleDoppler\/","article_published_time":"2022-01-20T19:46:52+00:00","article_modified_time":"2022-01-20T19:46:53+00:00","og_image":[{"width":750,"height":361,"url":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/JMJtik33-Screenshot-2022-01-20-14.03.25.png","type":"image\/png"}],"author":"Dawn Huddlestone","twitter_card":"summary_large_image","twitter_creator":"@Hville_Doppler","twitter_site":"@Hville_Doppler","twitter_misc":{"Written by":"Dawn Huddlestone","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/#article","isPartOf":{"@id":"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/"},"author":{"name":"Dawn Huddlestone","@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/d5d919046b2224f1b6b8bc9c585ff4a3"},"headline":"Etwell Rd culvert replacement a priority to prevent failure this spring","datePublished":"2022-01-20T19:46:52+00:00","dateModified":"2022-01-20T19:46:53+00:00","mainEntityOfPage":{"@id":"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/"},"wordCount":920,"commentCount":0,"publisher":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#organization"},"image":{"@id":"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/#primaryimage"},"thumbnailUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/JMJtik33-Screenshot-2022-01-20-14.03.25.png","articleSection":["News"],"inLanguage":"en-CA","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/","url":"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/","name":"Etwell Rd culvert replacement a priority to prevent failure this spring - Huntsville Doppler","isPartOf":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#website"},"primaryImageOfPage":{"@id":"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/#primaryimage"},"image":{"@id":"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/#primaryimage"},"thumbnailUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/JMJtik33-Screenshot-2022-01-20-14.03.25.png","datePublished":"2022-01-20T19:46:52+00:00","dateModified":"2022-01-20T19:46:53+00:00","breadcrumb":{"@id":"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/#breadcrumb"},"inLanguage":"en-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/"]}]},{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/#primaryimage","url":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/JMJtik33-Screenshot-2022-01-20-14.03.25.png","contentUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2022\/01\/JMJtik33-Screenshot-2022-01-20-14.03.25.png","width":750,"height":361},{"@type":"BreadcrumbList","@id":"https:\/\/doppleronline.ca\/huntsville\/etwell-rd-culvert-replacement-a-priority-to-prevent-failure-this-spring\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/doppleronline.ca\/huntsville\/"},{"@type":"ListItem","position":2,"name":"Etwell Rd culvert replacement a priority to prevent failure this spring"}]},{"@type":"WebSite","@id":"https:\/\/doppleronline.ca\/huntsville\/#website","url":"https:\/\/doppleronline.ca\/huntsville\/","name":"Huntsville Doppler","description":"Read Local","publisher":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/doppleronline.ca\/huntsville\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-CA"},{"@type":"Organization","@id":"https:\/\/doppleronline.ca\/huntsville\/#organization","name":"Huntsville Doppler","url":"https:\/\/doppleronline.ca\/huntsville\/","logo":{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/","url":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg","contentUrl":"https:\/\/media-doppleronline-ca.s3-accelerate.amazonaws.com\/2025\/03\/logo-Canadian-1.jpg","width":760,"height":212,"caption":"Huntsville Doppler"},"image":{"@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/HuntsvilleDoppler\/","https:\/\/x.com\/Hville_Doppler","https:\/\/www.instagram.com\/huntsville_doppler\/"]},{"@type":"Person","@id":"https:\/\/doppleronline.ca\/huntsville\/#\/schema\/person\/d5d919046b2224f1b6b8bc9c585ff4a3","name":"Dawn Huddlestone","url":"https:\/\/doppleronline.ca\/huntsville\/author\/dawn\/"}]}},"_links":{"self":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/posts\/107962","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/users\/1903"}],"replies":[{"embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/comments?post=107962"}],"version-history":[{"count":0,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/posts\/107962\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/media\/108295"}],"wp:attachment":[{"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/media?parent=107962"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/categories?post=107962"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/doppleronline.ca\/huntsville\/wp-json\/wp\/v2\/tags?post=107962"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}